RE: [MW:17343] Pipe joint resting on the beam

many reason
1- how can you check hydro test line check
2-how can painting apply
3-how can check joint during period inspection per year or two year
 
 
regards
Mahmoud
 
qc engineer  
 

Date: Wed, 10 Apr 2013 12:54:55 +0300
Subject: [MW:17330] Pipe joint resting on the beam
From: sumod.sadhupuram@gmail.com
To: materials-welding@googlegroups.com

sir,
 
Please explain the basic reason for not permitting the practice as seen in attached photo.
 
sumod
 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
 
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
 
 

No comments:

[MW:34866] Presentation for WPS ,PQR AND WPQ as per ASME Sec IX in power point

Dear Experts.        If anyone having presentation of WPS,PQR and WPQ  as per ASME  SEC.IX  in power point then please share . Regards Sanja...