Mr. Lijilal,
a. Please check up the date of manufacturing of the electrode. Generally up to 12 months is OK, but not for
xay quality welds. 6 months from manf. date should be better.
b. Dry the electrodes at 300 deg. C for min. 2 hrs and not the total duration.
c. If required dry them at 350 deg. C for 1 hour and see the results. may be it should be OK.
d. Change the brand if it is also not working out.
Sridhar.
From: jiji lal <jijilalkm@gmail.com>
To: materials-welding@googlegroups.com
Sent: Saturday, 13 April 2013 10:36 AM
Subject: [MW:17372] PRE HEAT PROCEDURE OF E 7016 -1 ELECTRODE
SIR,
I'm engaged with welding of API 5LX 80 grade pipeline for regassified LNG transmission . We do Tie-in method using SMAW+FCAW.To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
http://www.linkedin.com/groups/MaterialsWelding-122787?home=&gid=122787&trk=anet_ug_hm
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
---
You received this message because you are subscribed to the Google Groups "Materials & Welding" group.
To unsubscribe from this group and stop receiving emails from it, send an email to materials-welding+unsubscribe@googlegroups.com.
For more options, visit https://groups.google.com/groups/opt_out.
No comments:
Post a Comment